Your office address, desks and meeting rooms can stay exactly where they are when the company changes its name. What gives the old identity away is often a handful of highly visible details: the outline left by reception lettering, a former division name on a glass door or a video call framed against yesterday’s colours. If those are the problems you need to solve, the useful starting document is a list of surfaces and messages that must change. A whole-office construction price tells you very little about that job.
CBD Projects LLC can scope an office decoration contract around the identity your company has already approved. We translate it into measured interior elevations, finish samples, installation details and work packages for the spaces you occupy. You retain control of the name, artwork and wording. Tell us what visitors and colleagues should see on the first day of the change, which areas can close, and which existing finishes you want to keep. Where the brief also requires moving departments, replacing building services or rebuilding rooms, our office fit-out team can review those works separately.
Walk the office with someone who has never visited
Start outside the suite at the point where your host normally meets a guest. Walk to reception, take a seat and continue to the meeting room. What name did you see first? Could you tell whether you had arrived at the right company before opening the door? A reception logo visible from the desk chair may be invisible to the arriving visitor because a door frame cuts through it. Photograph each decision point from the visitor’s position. These photographs make a better briefing sequence than a collection of close-ups taken square to every wall.
Repeat the walk with the receptionist or workplace manager. The receptionist knows where a courier waits and which meeting rooms guests habitually confuse. The manager knows which finishes were installed by the landlord and which can be changed by the tenant. Mark the interior items within the proposed contract and put shared lobby directories and external signs on a separate enquiry list. This keeps the price for the tenant’s interior useful while the relevant parties consider any work outside the suite.
Turn the brand guide into a room schedule
A brand guide can specify how a mark should look without telling an installer where it belongs. For each location, record the room, the viewing direction, the message, its intended life and the person who can approve it. Give each item a reference that appears on the drawing, the proof and the quotation. “Reception back wall, item R1” is much easier to inspect and replace than a price headed “branding throughout.”
Distinguish permanent identity from content the workplace team expects to change. The company name behind reception might be retained for years. A list of team names on the opposite wall could be out of date after the next reorganisation. Consider a changeable insert, panel or other accessible treatment for the latter. If you have Arabic and English names, supply the approved versions together and agree who signs off their relationship on the proof. The final check needs to include reading order, line breaks and punctuation as they appear at the actual size.
Survey what the new finish will cover
A wall can look ready for lettering until the old logo comes off. Previous fixings may have left holes, exposed a different paint colour or damaged the surface beneath an adhesive. Ask the surveyor to identify where the original material is known, where the backing is concealed and where a trial could be carried out with the occupier’s consent. Record whether repair, preparation and repainting are included and how far they extend. A small patch in the middle of a wall can be more visible than a full repaint to a corner.
Glass requires a different record. Note which side is accessible, which direction the graphics will be read from and whether a moving door will line up with the adjacent fixed panel when it closes. Record the markings already in use so the design review can account for their purpose. For a retained timber or stone surface, ask about the owner’s restrictions on fixings and adhesives before selecting a method. A freestanding or removable element may be preferable when the substrate is valuable or must later be returned in an agreed condition.
Judge the sample in reception, not in an inbox
A colour approved on a monitor can look quite different across a painted wall, a printed panel and lettering with a reflective face. Request physical samples for the combinations visitors will see together. Put them on the intended wall, with the room lighting set as staff normally use it. Look once from the entrance and once from the waiting seat. Agree whether the intended result is a close match, a deliberate contrast or a quieter finish that allows the lettering to stand out.
Use a full-size paper outline before releasing expensive fabricated pieces. It can show that the intended mark sits behind a monitor, looks cramped above the desk or disappears when a tall visitor stands at reception. Where the location also serves as a video-call background, test the outline using the office’s usual camera position. Write the selected dimensions, finish references and viewing positions onto the approval sheet. The installer then has a record that can be checked on site when the furniture returns.

Separate the artwork proof from the installation drawing
Marketing may approve the artwork while facilities is still establishing whether the item can be installed at that location. Keep two clear releases. The artwork proof carries the final name, graphic proportions and any approved language versions. The measured elevation establishes heights, edges, adjoining finishes, obstructions and the part that can be removed for maintenance. CBD prepares the interior design details and shop drawings in house within the agreed scope. Identify any information still due from a specialist fabricator beside the specific item.
For example, the client might approve the reception lettering on Monday and then discover that the backing panel would cover an access hatch. Retain the signed artwork and revise the mounting arrangement. Show the hatch open on the next elevation, place the affected order on hold and ask the appropriate reviewers to release the amended drawing. This avoids sending marketing back through a complete identity approval while still giving facilities a genuine decision before material is cut.
Arrange installation around a working office
Choose areas that can be handed back independently. If clients must continue using reception, consider whether a secondary meeting room can receive them while the wall is prepared and finished. Decide who moves the equipment, who protects the desk and where staff can collect deliveries in the meantime. The sequence needs to account for the selected products’ preparation and drying requirements as well as time spent fixing the final pieces. A single out-of-hours booking may cover removal but leave another visit necessary.
A Dubai commercial building may have its own contractor access, delivery and work-review arrangements. Supply the location, landlord handbook and any management correspondence with the enquiry. Describe the actual work, including any new connections or changes outside the demise. For premises within Dubai Development Authority jurisdiction, the authority publishes a fit-out permit service. The applicable route should be checked against the premises and defined scope. CBD can prepare and coordinate relevant applications within its appointment. The reviewer decides the outcome, and the agreed start sequence should reflect it.
Change room names without losing existing bookings
Room names often appear in three places: on the door, in the calendar and on the instructions sent to visitors. Suppose the client renames the Cedar room as the Atlas room and installs the new lettering on a Friday. A visitor arriving on Monday may still have a Cedar booking, and the receptionist covering the desk may know only the new name. Give facilities a short list pairing old names with new ones and identifying the rooms on the measured plan. The client can use it to update digital systems and visitor instructions on the right date.
Agree which messages need a temporary cross-reference, where it belongs and who removes it. If only the reception wall is changing in the first phase, leave the room names off that release. A clear cutover list helps the office keep its appointments and lets the contractor price temporary items separately from the finished scheme.
Compare quotations item by item
For an existing reception wall, compare at least the removal method, the assumed condition behind the old lettering, the extent of refinishing, the approved new item and the method for returning the area to use. Two quotations can both include installing a new company name while only one includes removing adhesive marks across the previous logo footprint. Ask how an unexpected condition will be documented and priced before the work proceeds. That gives your buyer something more concrete to compare than the cost per letter.
Other cost factors include the number of locations, repeated or one-off sizes, artwork readiness, material samples, access equipment, evening attendance, and whether separate visits are required for proofing and installation. If several branches are involved, agree the first installation as a reference and price later locations against their own measured conditions. Distinguish artwork development supplied by your agency from proof preparation and site coordination. The quotation should identify which files the client will receive if a room name needs to be replaced later.
Bring your brief into focus
Send one photograph from the visitor’s approach, your approved name or artwork status, and the date the space must be ready. We can scope the first elevation and sample review.
Send your project briefAccept the work in the order a visitor sees it
Begin at the entrance with the approved wording and location schedule in hand. Check each item from its intended approach and again at close range. Look across the wall where previous lettering was removed. Open the door carrying the room name and view the meeting room from both sides of the glazing. Then restore the desk accessories and display screens. What looks aligned in an empty room can be hidden when the office resumes normal use.
Record a separate decision for each defect or change. A wrong spelling refers back to the proof. A misplaced letter refers to the elevation. A request for a different colour after an approved installation is a new client decision. At handover, ask for the item list, finish references, available care information and the approved versions of replaceable messages. Identify which original artwork files remain with your agency. A workplace manager should be able to order a replacement room label without reopening the entire office decoration brief.
Frequently asked questions
What if the identity is confidential until launch day?
Nominate one client representative to release artwork and list who may see the proofs. Agree when mock-ups can be displayed, where deliveries will be stored and when old marks should disappear. The installation team can then price the launch sequence against the actual access available. Sensitive campaign files can be exchanged through the route agreed with your team.
Can we retain the partitions, reception desk and lights?
Often these are the starting constraints for the decoration scheme. Show their positions on the plan and flag any planned furniture moves. A desk staying in place influences working access and the visible height of lettering. Existing lighting can be used to review finish samples before deciding whether any separate technical work is worthwhile.
How do we choose between a permanent finish and a replaceable panel?
Ask how frequently the message changes and who will replace it. A permanent treatment may suit an established identity on a stable backing. A departmental name that changes often may justify a replaceable face even if its initial price is higher. Compare a future replacement visit, potential making good and disruption to the rooms around it alongside the first installation cost.
What does CBD need to scope our first appointment?
Start with a redacted plan, photographs taken from the entrance and waiting area, and a short list of what must change before staff or visitors return. State whether the artwork is approved and whether the office must stay open. If only one location is urgent, identify it. We can scope the survey, drawings, sample review and decoration works around that first decision.